Zalakaros

Delivery of the greenfield municipal wastewater treatment plant in Zalakaros with full mechanical and biological treatment plus quaternary treatment with sand filtration, with a capacity of 1,600 m3/day.

Project overview

Treatment capacity

1 600

m3/day

Population equivalent

14 000

PE

Our role

As main contractor, we carried out the permit and detailed design, construction, technology supply and implementation, instrumentation, process control and the trial operation.

01

The client

The client was the Municipality of Zalakaros. The plant is operated by Délzalai Víz és Csatornamű Zrt..

02

What we did

As a greenfield project, we delivered the entire plant: besides mechanical and biological treatment, it includes quaternary treatment with sand filtration. We handled everything from design through instrumentation and process control to the trial operation.