Vác

Installation of a sludge thickening line at the municipal wastewater treatment plant in Vác.

Vác

Project overview

Treatment capacity

18 000

m3/day

Population equivalent

116 673

PE

Our role

We carried out the design and construction, supplied the technology and also provide servicing.

01

The client

The client was the Municipality of Vác. The plant is operated by DMRV Zrt..

02

What we did

We installed a new sludge thickening line at the municipal treatment plant in Vác, handling everything from design and technology supply through construction to servicing.