Tarnaméra
Construction of the Tarnaméra agglomeration wastewater treatment plant with two continuous-process biological lines, a sludge line and sludge storage, with a treatment capacity of 450 m3/day.

Project overview
Treatment capacity
450
m3/day
Population equivalent
5 402
PE
Our role
As general contractor, we carried out the detailed design and the construction, mechanical and electrical works within the site, supplied and installed the equipment and ran the trial operation.
01
The client
The client was the Municipalities of Tarnaméra, Nagyfüged and Boconád. The plant is operated by Heves Megyei Vízmű Zrt..
02
What we did
We delivered all works within the site (as a “small general contractor”): detailed design, construction, mechanical and electrical works, supply and installation of the equipment, and the trial operation of the plant.