Tarnaméra

Construction of the Tarnaméra agglomeration wastewater treatment plant with two continuous-process biological lines, a sludge line and sludge storage, with a treatment capacity of 450 m3/day.

Tarnaméra

Project overview

Treatment capacity

450

m3/day

Population equivalent

5 402

PE

Our role

As general contractor, we carried out the detailed design and the construction, mechanical and electrical works within the site, supplied and installed the equipment and ran the trial operation.

01

The client

The client was the Municipalities of Tarnaméra, Nagyfüged and Boconád. The plant is operated by Heves Megyei Vízmű Zrt..

02

What we did

We delivered all works within the site (as a “small general contractor”): detailed design, construction, mechanical and electrical works, supply and installation of the equipment, and the trial operation of the plant.