Siófok

Delivery of the municipal wastewater treatment plant in Siófok: ContiSeq™ cyclic technology, sludge digestion, dewatering, solar sludge drying and a biogas line with two CHP units, with a treatment capacity of 20,000 m3/day.

Siófok

Project overview

Treatment capacity

20 000

m3/day

Population equivalent

~170 000

PE

Biogas production

3 788

Nm3/day

CHP electrical output

250+150

kW

Technology

ContiSeq™

Our role

As general contractor, we carried out the permit and detailed design, supplied and installed the main process units, delivered the complete biogas line and managed the plant's trial operation.

01

The client

The client was the Municipality of Siófok. The plant is operated by DRV Zrt..

02

What we did

The plant's technology: ContiSeq™ cyclic technology, sludge digestion, dewatering, solar sludge drying and a biogas line with two CHP units. We delivered the complete biogas line. We also carried out servicing and maintenance at the plant.

Reference video