Siklós
Delivery of the municipal wastewater treatment plant in Siklós: cyclic technology with sludge dewatering, with a treatment capacity of 2,500 m3/day.
Project overview
Treatment capacity
2 500
m3/day
Population equivalent
~11 300
PE
Our role
As a member of the joint venture, we carried out the permit and detailed design, supplied and installed all process units and fully managed the trial operation.
01
The client
The client was the Municipality of Siklós. The plant is operated by DRV Zrt..
02
What we did
The plant's technology: cyclic technology with sludge dewatering. It has a hydraulic capacity of 2,500 m3/day and a biological capacity of ~11,300 PE.