Sándorfalva

Turnkey delivery of the municipal wastewater treatment plant in Sándorfalva: cyclic technology with sludge dewatering, with a treatment capacity of 2,250 m3/day.

Sándorfalva

Project overview

Treatment capacity

2 250

m3/day

Population equivalent

~12 550

PE

Our role

As main contractor, we prepared the permit and detailed designs, delivered the entire plant on a turnkey basis and managed the trial operation.

01

The client

The client was the Municipality of Sándorfalva. The plant is operated by Alföldvíz Zrt..

02

What we did

The plant's technology: cyclic technology with sludge dewatering. It has a hydraulic capacity of 2,250 m3/day and a biological capacity of ~12,550 PE. We also carried out servicing and maintenance at the plant.