Kistelek

Turnkey delivery of the municipal wastewater treatment plant in Kistelek: ContiSeq™ cyclic technology with sludge dewatering, with a treatment capacity of 800 m3/day.

Project overview

Treatment capacity

800

m3/day

Population equivalent

~8 470

PE

Technology

ContiSeq™

Our role

As main contractor, we prepared the permit and detailed designs, delivered the entire plant on a turnkey basis and managed the trial operation.

01

The client

The client was the Municipality of Kistelek. The plant is operated by Alföldvíz Zrt..

02

What we did

The plant's technology: ContiSeq™ cyclic technology with sludge dewatering. It has a hydraulic capacity of 800 m3/day and a biological capacity of ~8,470 PE. We also carried out servicing and maintenance at the plant.