Csákvár
Expansion of the municipal wastewater treatment plant in Csákvár with two new continuous-process biological lines and a sludge line, to a treatment capacity of 750 m3/day.

Project overview
Treatment capacity
750
m3/day
Population equivalent
5 563
PE
Our role
As general contractor, we carried out the detailed design and the construction, mechanical and electrical works within the site, supplied and installed the equipment and ran the trial operation.
01
The client
The client was the Municipality of Csákvár. The plant is operated by Fejérvíz Zrt..
02
What we did
We delivered all works within the site (as a “small general contractor”): detailed design, construction, mechanical and electrical works, supply and installation of the equipment, and the trial operation of the expanded plant. We also carried out servicing and maintenance at the plant.