Bugyi

Brownfield delivery of the municipal wastewater treatment plant in Bugyi: continuous biological wastewater treatment with sludge treatment and composting, with a treatment capacity of 800 m3/day.

Project overview

Treatment capacity

800

m3/day

Population equivalent

7 269

PE

Our role

As general contractor, we carried out the on-site general design and the complete turnkey construction, and managed the trial operation.

01

The client

The client was the Municipality of Bugyi. The plant is operated by Daköv Kft..

02

What we did

New technology was built on the site of the existing plant: continuous biological wastewater treatment with sludge treatment and composting. We handled everything from general design through turnkey construction to managing the trial operation.