Bikács

Construction of the Bikács agglomeration municipal wastewater treatment plant with biological lines, a sludge line and sludge storage, with a treatment capacity of 590 m3/day.

Bikács

Project overview

Treatment capacity

590

m3/day

Population equivalent

6 620

PE

Our role

As general contractor, besides the complete construction we obtained the necessary permits, prepared the detailed and as-built designs and ran the trial operation.

01

The client

The client was the Municipalities of Bikács, Györköny, Pálfa, Pusztahencse and Vajta. The plant is operated by ERÖV Zrt..

02

What we did

The plant was built with biological lines, a sludge line and sludge storage. Alongside the complete construction works, we also handled permitting, the detailed and as-built designs and the trial operation.