Construction of the Bikács agglomeration municipal wastewater treatment plant with biological lines, a sludge line and sludge storage, with a treatment capacity of 590 m3/day.

Project overview
Treatment capacity
590
m3/day
Population equivalent
6 620
PE
Our role
As general contractor, besides the complete construction we obtained the necessary permits, prepared the detailed and as-built designs and ran the trial operation.
01
The client
The client was the Municipalities of Bikács, Györköny, Pálfa, Pusztahencse and Vajta. The plant is operated by ERÖV Zrt..
02
What we did
The plant was built with biological lines, a sludge line and sludge storage. Alongside the complete construction works, we also handled permitting, the detailed and as-built designs and the trial operation.