Brownfield delivery of the municipal wastewater treatment plant in Bicske: continuous biological wastewater treatment with sludge treatment and stormwater storage, with a treatment capacity of 2,492 m3/day.

Project overview

Treatment capacity

2 492

m3/day

Population equivalent

20 232

PE

Our role

As general contractor, we carried out the on-site general design and the complete turnkey construction, and managed the trial operation.

01

The client

The client was the Municipality of Bicske. The plant is operated by Fejérvíz Zrt..

02

What we did

New technology was built on the site of the existing plant: continuous biological wastewater treatment with sludge treatment and stormwater storage. We handled everything from general design through turnkey construction to managing the trial operation. We also carried out servicing and maintenance at the plant.