Békéscsaba
Delivery of the municipal wastewater treatment plant in Békéscsaba: cyclic technology, sludge digestion, dewatering, sludge composting and a biogas line with CHP, with a treatment capacity of 20,000 m3/day.

Project overview
Treatment capacity
20 000
m3/day
Population equivalent
~133 000
PE
Biogas production
2 600
Nm3/day
CHP electrical output
250
kW
Our role
As a consortium member, we carried out the permit and detailed design, supplied and installed the main process units, built the biogas facilities and fully managed the trial operation.
01
The client
The client was the Municipality of Békéscsaba. The plant is operated by Alföldvíz Zrt..
02
What we did
The plant's technology: cyclic technology, sludge digestion, dewatering, sludge composting and a biogas line with CHP. We delivered the complete biogas line. We also carried out servicing and maintenance at the plant.